walkdown.ioConcept · equipment isolationOpen the live screen

Transfer Pump A · P-9204 · Industrial Engine Room

Isolation, before and after

Same asset, same scan. The 480V breaker is an empty slot until it is linked, the shutoff order follows SOP-ER-130, and the list is usable at the pump.

Before · example portalIsolated by (2), valves only
Wwalkdown.ioSample client

NavVis-style scan · markers carry no energy type

Asset record

Transfer Pump A

B2 - Process Level 1 · P-9204

WIN 04 01 01 05 30 92 500 0

InfoDocsSpecsLive
AreaB2 - Process Level 1
SystemTransfer
ServiceProcess transfer
OwnerR. Calloway
CriticalityA
StatusIn service
Verified2026-06-14

V-1204S Gate valve - normal open - B2 - Pr...

V-1204D Gate valve - normal open - B2 - Pr...

No empty slot. Breaker 4B-01 is not in this list.

After · this conceptElectrical slot, then the order
walkdown.ioSingle source of truth

Sample client

Example portal

P-92044B-01480VV-1204SV-1204D
Scanned Jun 2026

Energy

5 m
Breaker 4B-01 is not linked

At the pump · 390 wide

The example portal blocks the phone. The field list keeps the same three points, with tap targets sized for gloves.

Before · 390 px

Walkdown.io needs a bigger screen.

Laptop, tablet, or desktop.

Demo the app instead

iPhone: Share, then Add to Home Screen.
Android: menu, then Install app.

Or, share the portal to access it elsewhere.

app.walkdown.io

Email it
After · 390 px
walkdown.ioField lockout

At the pump

Transfer Pump A

P-9204 · B2 – Process Level 1

2/3

linked

1 of 3 points not linked

Breaker 4B-01 (480V) has a record but isn't linked.

Shutoff order

  1. 1Open + lock breaker 4B-01B1 Electrical Room · MCC 4B · verify zero energy
  2. 2Close + lock suction valve V-1204SB2 Process Level 1
  3. 3Close + lock discharge valve V-1204DB2 Process Level 1
Breaker 4B-01 is not linked